The Many Guises of Hazy Rebuild Requirements

Introduction

Jonathan Fries

Jonathan Fries

I work for Techtonic as the leader of the software delivery group. I am a Certified Scrum Product Owner.


Rebuild Application Rebuild Software Development

The Many Guises of Hazy Rebuild Requirements

Posted by Jonathan Fries on .
Featured

Rebuild Application Rebuild Software Development

The Many Guises of Hazy Rebuild Requirements

Posted by Jonathan Fries on .

Clients frequently request that we use existing applications as the basis for work when we are rebuilding or recreating a system with them.

This is very difficult. It can work, but it is much less effective for developers and results in a lot of iterations as the dev team goes back and forth figuring out what an application needs to do. It leads to a lot of bugs that are only discovered in UAT.

In the beginning it is much more efficient for your business stakeholders, which is why they ask for it. Why go through the existing application and document it? That's a lot of work for users and business people, not to mention the BAs you have to pay to do it.

In the end, the same people who didn't want to go through the process of documenting will be mad because it is taking so long. It is your responsibility as a developer, lead, or PM to set the right expectations in the beginning.

If your stakeholder (whether client, boss, CEO, etc.) requires you to work this way you need to expose the risk and set appropriate expectations. The very best case scenario is that you have to set aside time for late project iterations when you run into these challenges. The worst case scenario is that the project will drag on so long that will be cancelled. It happens all the time. Also possible: you fixed-bid the project and put your company out of business trying to complete it.

Setting the right expectations can be difficult, and that is a topic for another post some time. My goal today is just to describe a few of the ways this has come up over the years, so you know what to look out for.

  1. Just make the new app do what the old one does. Why do you need requirements? An all-time classic. Why not? I mean there's already code, how hard can be to just: read it, understand it, understand all the subcomponents and UI, assess whether or not it is still necessary, talk to users, and figure out how to test it. It definitely wouldn't be easier to have that done and approved before you start development. Danger level: Red Flag
  2. Preserve the business logic, everything else you can get rid of. This assumes that preserving the business logic is easy, which it usually isn't. Even when someone has done a good job of separating business logic from UI and data access (very rare) often the technical and business requirements of the rebuild make reusing the code in its original form impossible. Danger level: Yellow Flag
  3. We'll figure it out as we go along. This one can seem reassuring in that your stakeholder has seemingly granted you permission to iterate. But be careful here: set expectations, ask follow-up questions, establish what 'figuring it out' will really look like. Danger level: Yellow Flag
  4. There's a lot you can re-use. Just tell me what it will cost to rewrite the things that you can't re-use when it comes up. You should assume that you are rewriting everything. If you get to re-use something that's a win. It will most likely save you a little time in testing, but not anywhere else. Danger level: Yellow Flag
  5. You don't need to talk to users. Bob knows everything about this application and Bob is your main point of contact. Unless Bob is the only user (and even then) he almost certainly doesn't know everything. Even if Bob isn't an ego-maniac (and he might be) you are still facing delays in understanding the system because Bob has to go ask someone instead of you asking them. Danger level: Red Flag
  6. This spreadsheet will tell you everything that you need to know about the system. AKA Our old system was a spreadsheet, just look at that. Usually these are worse than looking at code because in addition to code (like VBA) you also get things like embedded charts, formulas in cells, and obsure data access thrown into the mix, requiring even more detailed reading to understand. Danger level: Red Flag
  7. Jennifer developed most of the original system and she'll be working closely with you on this project. Usually Jennifer is retiring, and that is a hard deadline. Also, what does most mean? Danger level: Red Flag
  8. We have all the requirements from 20 years of work we did on the old system. You can read through that. To paraphrase Sartre, Hell is other people's requirements documents There are a few reasons why this is true, but probably the most profound is that writing the requirements document immerses the team members in the system. Without having written it, asked the questions, and fully digested the material then you or your BA will always be at a deep disadvantage. I wish this weren't true, but it is. At least 50% of the reason for documenting stuff is to make sure the person responsible really understands it. Danger level: Red Flag